MTPO Policy Board Meeting
MTPO Policy Board
2 items Thu, May 25, 2023 at 1:30pm
Agenda
TIP Amendment 12 (2 of 2)
 Approved
∙ Agenda item 2 of 2
TIP Amendment 12
a. KA-5483-02: K-4 in Shawnee County 1R Project Guardrail Upgrades (Amended 21% Cost Increase) b. KA-6740-01: Repair Bridge #’s 154, 162 onUS-75 (Amended Added Bridge #162 to scope) c. KA-6930-01: Repair Bridge #162 on US-75 in Shawnee County (New) d. KA-6932-01: Repair Bridge #039 on I-70 in Shawnee County (New) e. KA-6933-01: Repair Bridge #261 and #262 on K-4 in Shawnee County (New) f. KA-3236-01: US-24: From Kansas Avenue, east to SN/JF County Line (Pavement Replacement) (Revision: Time Change) g. TE-0505-01: Topeka Bikeways Phase 4 project; Kansas Ave Bridge & Roadway from SW 3rf St. to NE Laurent St. Reduce on southbound vehicle lane and install interim bi-directional separated bike facilities. Project Canceled as a TA project, and has now been packaged with the Polk/Quincy Viaduct Renovation. Revision

Files

1 2021-2024 TIP Amendment 12 Summary sheet ( 2.56 MB )
1-KA-5483-02 ( 0.42 MB )
2-KA-6740-01 ( 0.42 MB )
3-KA-6930-01 ( 0.42 MB )
4-MTPO KA-6930-01 Map ( 0.38 MB )
5-KA-6932-01 ( 0.42 MB )
6-MTPO KA-6932-01 Map ( 0.3 MB )
7-KA-6933-01 ( 0.42 MB )
8-MTPO KA-6933-01 Map ( 0.3 MB )
9-KA-3236-01 ( 0.42 MB )
10-2023 UPWP Revision page ( 0.56 MB )
Public Comments
Commenting on this item has ended.
Online comments closed at 11:30 AM CDT 5/24/23.
No comments were received.