Active Project
SW Moundview Drive
Utilities Department Water Line Replacement Project
Project Overview
 The City of Topeka is replacing approximately 1,200 linear feet of existing 6-inch water main and installing approximately 1,400 linear feet of new 6-inch water main to improve water system reliability in the area.

A public meeting was held on Monday, March 2, 2026 at The Gathering Place (4500 SW Gage Blvd.), where there was a presentation on the project.

Anticipated Project Dates: March 2026 - July 2026
Location
Representatives
Duncan Theuri
Project Engineer / City of Topeka
[email protected] 785-368-0152
Tim McCormick
Construction Inspector / City of Topeka
[email protected] 785-368-2409
Steve LaCasse
Design Engineer / United Engineering Group
[email protected] 785-806-2806
Chance Gier
Contractor / Farmer Excavating, Inc.
[email protected] 785-863-2404
Resources
Presentation ( 1.12 MB )
Postcard ( 1.12 MB )
Stay Informed
Subscribe for periodic updates. 0 community members are following this project.
Public Comments
Commenting is currently closed on Topeka Speaks for this project.
No comments yet.